Major Reports

pdf 08/2021 - Construction Completion Final Report, Bulkhead Barrier Wall


Parcel III


pdf 06/2021 - Pre-Design Investigation (PDI) Data Report Addendum – 545 Sackett Street (Parcel III) Fulton Municipal Works Former MGP Site

pdf 02/2021 - Pre-Design Investigation (PDI) Work Plan Addendum – 545 Sackett Street (Parcel III) Fulton Municipal Works Former MGP Site

pdf 02/2019 - Pre-Design Investigation (PDI) Work Plan – 545 Sackett Street (Parcel III) Fulton Municipal Works Former MGP Site

pdf 07/2018 - Draft Pre-Design Investigation (PDI) Work Plan – 545 Sackett Street (Parcel III) Fulton Municipal Works Former MGP Site


pdf Remedial Design Work Plan Approval Former Fulton MGP

pdf Remedial Design Work Plan Former Fulton MGP

pdf Pre-Design Investigation Work Plan Former Fulton MGP – Letter of Approval

pdf Pre-Design Investigation (PDI) Work Plan Fulton Municipal Works Former Manufactured Gas Plant

pdf Fulton Works Proposed Remedial Action Plan, April 2015

pdf Feasibility Study, Fulton Municipal Works Former Manufactured Gas Plant Site, March 2015


Fulton MGP Interim Remedial Measure (IRM) Pre-Design Investigation (PDI) Data Summary Report (April 2013)


pdf Fulton MGP IRM PDI Data Summary Report Approval Letter

pdf Fulton MGP IRM PDI Data Summary Report Text

pdf Fulton MGP IRM PDI Data Summary Report Tables

pdf Fulton MGP IRM PDI Data Summary Report Figures

pdf Fulton MGP IRM PDI Data Summary Report Appendix A

pdf Fulton MGP IRM PDI Data Summary Report Appendix B

pdf Fulton MGP IRM PDI Data Summary Report Appendix C

pdf Fulton MGP IRM PDI Data Summary Report Appendix D

pdf Fulton MGP IRM PDI Data Summary Report Appendix E

pdf Fulton MGP IRM PDI Data Summary Report Appendix F

pdf Fulton MGP IRM PDI Data Summary Report Appendix G

pdf Fulton MGP IRM PDI Data Summary Report Appendix H

pdf Fulton MGP IRM PDI Data Summary Report Appendix I

pdf Fulton MGP IRM PDI Data Summary Report Appendix J


Final Remedial Investigation Report, July 2012


pdf Fulton Remedial Investigation (RI) Text – July 2012

pdf Fulton Remedial Investigation (RI) Tables

pdf Fulton Remedial Investigation (RI) Figures

pdf Fulton RI Appendix A – NYSDEC Approval Letters and Field Decision Confirmation Form

pdf Fulton RI Appendix B – Representative Site Photographs

pdf Fulton RI Appendix C – Historical Information and Historical Study of Gowanus Canal

pdf Fulton RI Appendix D – Environmental Records Information

pdf Fulton RI Appendix E – Soil Boring Logs, Monitoring Well and Test Pit Logs

pdf Fulton RI Appendix F – DUSRS Form 1s

pdf Fulton RI Appendix G – Hydraulic Conductivity Calculations

pdf Fulton RI Appendix H – Indoor Air Sampling Information

pdf Fulton RI Appendix I – 270 Nevins St. Oversight Report 4-12

pdf Final IRM Pre Design Investigation Work Plan March 2012

pdf Fulton Nevins Street Additional Scope Letter Plan

letter.hw224051.2011-04-08.Addendum 2 Revised Final RIWP

pdf Final Revised Fulton RIWP Addendum No. 2

pdf Fulton RIWP addendum for off-site investigation

Fulton Former MGP Site Characterization Investigation Report

Fulton MGP - Remedial Investigation Work Plan