Weekly Update – Week Ending March 25, 2011

Remedial Investigation

Remedial Investigation field work at the former Fulton Municipal Works MGP is being conducted under a New York State Department of Environmental Conservation (NYSDEC) and New York State Department of Health (NYSDOH)-approved Remedial Investigation Work Plan (RIWP).  The work includes the installation of soil borings, monitoring wells, test pit excavations, and soil vapor points to gather information required to determine the nature and extent of impacts within the footprint of and adjacent to the former Fulton Municipal Works MGP. 

chatgpt writing prada pattina bag prada pattina bag self addressed postcard rob thomas wife lupus mike and tom eat snacks element construction famoid instagram followers prada trifold wallet prada bae meaning prada cloudbuster mike and tom eat snacks prada sunglas prada loafter boots prada prada pr 17 chatgpt trial mellow johnny's jersey prada sunglasse chatgpt and education red prada loafers prada cleo dupe burberry mens outlet tamagotchi pet prada botines ios chatgpt app chatgpt npr pantone indigo prada aus prada luna black prada silver pumps dolce and gabbana outlet online rosemont il dining prada wallet used prada clothes sale prada shoes dhgate boat captains hat www.gucci.com usa chatgpt technology fendi clearance outlet prada 90s prada crystal skirt opoli vs uber prada bowtie prada strap sneakers rosemont lunch prada watch ladies la prada dental authentic prada bag prada pr06ys prada button dr patel tampa house versace outlets mnii original prada bags prada purse dupe gucci shoes and bags instagram reset followers gold prada sunglasses chatgpt 调教 online outlet usa prada shoelaces rosemont il dining prada rectangle glasses aaa san juan capistrano nike shoes outlet store chatgpt technology free chatgpt alternative instagram api followers prada orange purse cork board black m.nii clothing prada cardholder manuel prada borse prada prada sport shoes vancouver riots kissing carlucci's instagram followers stuck fx make up designer outlet malls prada chain purse brown wig cap suede prada bag yokohoma prada 600 instagram followers extra large cork board million instagram followers indigo pantone color


Based upon the findings of the field work completed to date, National Grid and NYSDEC agreed that additional off-site investigations were needed in the vicinity of the MGP.  The off-site work is described in the July 20, 2009 RIWP Addendum.  National Grid completed these additional off-site field installation activities at the beginning of August 2009.  At the request of NYSDEC, National Grid recently developed and revised a second RIWP (Addendum No. 2) to complete additional investigations to the west of the MGP.  The work is described in the February 2, 2011 Revised Final RIWP Addendum No.2.  These documents are available in the Key Documents/Major Reports section of this website.

Activities March 19 through March 25:

  • Surveyed foundation excavations, site features and Revised Final RIWP Addendum No. 2 boring locations.

Future (two week look-ahead) activities:

  • Complete utility survey and pre-clearance of remaining proposed Revised Final RIWP Addendum No.2 boring and monitoring well locations.